ARS: nightly replenishment for Mulmul
ARS keeps Mulmul's five markets stocked from three warehouses. Every night at 23:55 it verifies the three warehouse feeds, reconciles them against the live stores, snapshots the stock position, and proposes transfers. Planners review and approve the proposals the next morning in a four-stage workbench; approved transfers export to the ERP. It runs in production, built and operated by Mojito Labs.
Every night, in order.
Tonight's snapshot in --.
Nothing moves without a person saying so. The system proposes; planners decide. Every proposal carries its reasoning: demand by market, stock on hand and in transit, lead times, and the constraint that stopped it proposing more.
The problem.
Five expansion stores selling from three warehouses meant that the same units could be needed in two countries on the same day. Planners were balancing stock in spreadsheets from exports that were hours old, and the cost of being wrong was either a stock-out in a growing market or capital sitting in the wrong warehouse.
The brief was a system that saw the whole position every night, proposed what to move, explained why, and left the decision with the planners who understood the brand's seasons and campaigns.
How it is built.
Why it stays in production.
Planners trust it because they can overrule it, and they do when they know something it does not. Their overrides inform the next version.
Every proposal shows the demand, the stock and the constraint behind it. Nothing arrives as a number from a black box.
A missing feed, a reconciliation mismatch or an export error stops the run and tells a named person. Silent failure is the enemy of operational systems.
Stock-outs by market and capital in the wrong warehouse are the numbers it is judged on, reported monthly.
Asked about ARS.
No. It was built for Mulmul's warehouses, markets and ERP. The approach, data pipeline, proposals, approval workbench and export, is what we build again for other brands, on their data. AI systems engineering.
It forecasts demand per market and SKU and optimises transfers under constraints, rather than listing what is low. Where a simple rule did as well, we used the rule; the baseline told us which.
A first version proposing transfers in shadow mode within weeks, then supervised use, then write-back to the ERP once planners trusted it. It has been improved continuously since under our support plan with Mulmul.